Friday, June 22, 2012

PirTano Construction completed directional drilling the 8-inch water main along Forest Road.  The contractor is installing connections for the water main and installing fire hydrants. The contractor will be doing a water main connection on Monday which will require a shutdown for 4 to 6 hours beginning at 9 AM. During this time, the water main will be turned off. Notification is being passed out for the Monday shutdown. If an emergency water main shut-down is needed, you will be notified as soon as possible

The contractor should complete the water main installation and begin water main filling, testing and chlorinating.

Roadway grinding is being performed in anticipation of open cut storm sewer work beginning next week from mid block on Forest to the south end along the east side of the street.

Throughout the duration of the project, driveway access may be restricted, but will be restored to residences as soon as possible and at the end of each day. Thank you in advance for your patience. Please note the no parking on street signs posted for Monday through Friday 7 AM to 5 PM.