Friday, June 8, 2012

This past week, the contactor began working on-site by performing general job site set-up, layout, utility locates, and televising of the existing sewers.  The contractor also began the directional drilling for the new 8-inch PVC water main.

Next week the contractor will continue to directional drill the new 8-inch water main.

Throughout the duration of the project, driveway access may be restricted, but will be restored to residences as soon as possible and at the end of each day. Thank you in advance for your patience. Please note the no parking on street signs posted for Monday through Friday 7 AM to 5 PM.